Trademarks
US — United States (USPTO)US 79223322Live / RegisteredDesign / Logo

The mark consists of an abstract horizontal shape made up of two right a

USPTO 709 — Live / Registered

79223322Serial / App #
5624734Registration #
TMRKNSTSAFANABSTRKTHRSNTLSPMDAPAFTWRTAPhonetic Key
2017-06-21Filed
2018-12-11Registered
—Renewal / Expiry

Goods & Services (WIPO Nice Classification)

  • Nice Class 11Environmental ControlGoods

    Ventilation systems comprised of air impellers, exhaust fans and ventilation hoods; air filtration and air-conditioning installations; ventilation hoods; air flow regulators for air-conditioning, heating and ventilation, namely, dampers as control devices used in air ducts to regulate the flow of air; window ventilators; hygroregulated ventilators; ventilating louvers; exhauster ventilators; ventilation system elements, namely, air impellers, energy recovery ventilators, and ventilating exhaust fans; ventilation apparatus, namely, cordless floor drying cone dolly; ventilators for heat recovery; air-conditioners; air-conditioning system elements, namely, evaporative ail coolers; air-conditioning units; waste heat recovery ventilators; heating machines, namely, heating installations; radiators; air-purification installations, systems, devices and apparatus, namely, air purifiers, and air purifying apparatus and machines

Mark / Design Description: The mark consists of an abstract horizontal shape made up of two right angles connected by a wavy line.

Vienna / Design Codes: 26.17.25

Global Jurisdiction & Nice Class Footprint

Primary Office: United States (USPTO) · Nice Classes: 11

Visually & Phonetically Similar Marks Globally

Prosecution & Register History

DateCodeEvent
2017-12-21REPRSN ASSIGNED FOR SECT 66A APPL FROM IB
2017-12-26NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
2017-12-26DOCKASSIGNED TO EXAMINER
2017-12-30MAFRAPPLICATION FILING RECEIPT MAILED
2018-01-05CNRTNON-FINAL ACTION WRITTEN
2018-01-06RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
2018-01-18RFRRREFUSAL PROCESSED BY MPU
2018-01-18RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
2018-02-03RFNTREFUSAL PROCESSED BY IB
2018-07-15TROATEAS RESPONSE TO OFFICE ACTION RECEIVED
2018-07-15CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
2018-07-16TEMETEAS/EMAIL CORRESPONDENCE ENTERED