HANWALL
USPTO 709 — Live / Registered
Goods & Services (WIPO Nice Classification)
Solar panels for the production of electricity; charging stations for electric vehicles; batteries, electric; battery chargers; solar wafers; video screens; electrified fences; photoelectric converters; electronic control installations for the automatization of power station; lightning arresters; electrolysers; solar-powered battery chargers; solar cells; solar collectors for electricity generation; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity
Refractory construction materials, not of metal; roofing, not of metal, incorporating solar cells; non-metallic building boards; wall claddings, not of metal, for building; wall linings, not of metal, for building; roofing tiles, not of metal; buildings, not of metal; building glass
Production of energy; generation of electricity from solar energy; generation of electricity from wind energy; sandblasting services; metal casting; welding services; decontamination of hazardous materials; water treating; generation of electricity; generation of energy; production of energy by power plants
Global Jurisdiction & Nice Class Footprint
Primary Office: United States (USPTO) · Nice Classes: 9,19,40
Visually & Phonetically Similar Marks Globally
| Risk | Mark | Office & Status | Score |
|---|---|---|---|
| Moderate Risk | ANYWALL US 99342851 | US Live / Registered | 69% |
| Moderate Risk | HAAWAL US 79433148 | US Live / Registered | 69% |
| Moderate Risk | NEOWALL US 79446562 | US Live / Pending | 63% |
| Moderate Risk | HANSEL US 50037561 | US Live / Pending | 63% |
| Moderate Risk | HYGIAWALL FR 4637954 | FR Live / Registered | 62% |
| Moderate Risk | JENIWILL US 99889297 | US Live / Published | 60% |
Prosecution & Register History
| Date | Code | Event |
|---|---|---|
| 2019-04-18 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB |
| 2019-04-24 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED |
| 2019-04-24 | DOCK | ASSIGNED TO EXAMINER |
| 2019-04-24 | CNRT | NON-FINAL ACTION WRITTEN |
| 2019-04-25 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| 2019-04-30 | MAFR | APPLICATION FILING RECEIPT MAILED |
| 2019-05-20 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW |
| 2019-05-20 | CNRT | NON-FINAL ACTION WRITTEN |
| 2019-05-21 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
| 2019-06-07 | RFRR | REFUSAL PROCESSED BY MPU |
| 2019-06-07 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
| 2019-06-20 | NREP | NEW REPRESENTATIVE AT IB RECEIVED |